Project Management

Northeast Utilities, Year Completed 2008.

The Project Management services include the necessary costs associated to manage our client’s expectations by providing supervision of the technology system build out. ACT will perform as the client representative to execute and implement the processes of quality control and system commissioning per the original specifications.

Project Management will include necessary on-site project meetings to inspect all workmanship associated with the AV installation including inspection of conduits and junction boxes prior to the closure of walls and ceilings, electrical needs, LAN needs, etc. ACT will review the awarded AV Contractor’s shop drawings and cut sheet submittals prior to the fabrication of racks and installation. ACT will also provide close coordination with furniture manufacturing which is critical during this phase to ensure tight integration of the AV equipment into the related furniture (lecterns, tables, credenzas, etc.).

ACT’s project engineer will report on project status and provide AV project punch lists, system checkout review, and testing reports. The project engineer will respond to RFI’s and keep the client and design team abreast of the AV installation.

Share